Mostsolid and engineered floors can be {{{fitted| installed| laid using wood flooring adhesive. . There are two main techniques for installing using adhesive which will both be explained. Please remember that solid floors are always recommended to be glued down, not using the floating method.
Floating Floor Method
The floating floor method of fixing the wooden floor is done by gluing the tongues and grooves of the floor together. This creates a new floor which is �floating� over the original floor. Engineered floors can be floated over any solid sub floor and it is the preferred method for laying engineered floors.
{{{An advantage with the floating method is | It is a good option when the sub floor moisture content is unknown| because a damp proof membrane can be used between the floor and subfloor to prevent moisture rising into the new flooring. When floating a floor, an underlay must be used to cancel the effect of any echo and also provide a leveling effect to the sub-floor
This echo is caused by the wood flooring and the sub-floorwhich have a space between them. The noise echoes in this void. The underlay is used to prevent any echo as the two hard surfaces will not be touching with each other. The choice of underlay is huge for use when floating the floor � all of which are adequate. A very dense underlay is normall preferred as this ensures there is less sound echo from foot traffic. Generally the more dense an underlay the less noise!
To float the floor:
Lay out the damp screen ensuring that the edges of the membrane continue up the side of the skirting. and overlap the seams by 100mm roll out and cut in the underlay ensuring all areas of the floor are covered. Any areas left uncovered with the underlay will cause a bounce in the new floor and will be noisier. A PVA adhesive is used to glue the boards together.
Fit the floor by placing two beads of adhesive along the upper and lower sides of the �groove� joint. (It is a common mistake to think that the boards need to be glued along the �tongue� � this will simply push the adhesive too far into the joint and not create a firm bond between the boards.) You must ensure that the beads of glue are constant and not intermittent as this can cause the boards to creak if the joint is not constant.
Allow the glue to harden before using the floor Any glue residue which has spilled or oozed onto the boards can easily be wiped off a lacquered or oiled board, or sanded off an unfinished floor. It must be noted that thermo treated solid oak has less density therefore water based pva will not adhere to the timber as well as normal oak.
The Glue Down Method
The glue down method of fitting a floor consists of using a specified adhesive applied directly to the sub-floor such as F Ball B92 enabling the new floor to stick directly to the original floor. This is a very stable method which is the recommended option for most solid wood and parquet floors.
To install wood flooring using an adhesive, you must first ensure that the sub-floor is dry, level and structurally sound. When {{{installing| laying| fitting onto concrete it is best to prime the area first using a PVA based primer to ensure a good bond to the floor. Old concrete is recommended to be checked for moisture and or contamination before the boards are laid. Both engineered flooring and solid flooring can be laid using the glue down method.
Installing:
({{Fist and foremeost, |Firstly,| The first thing to do is}}} ensure the sub-floor is completely flat, free from dust and dirt and if necessary has been primed. Working in an area just large enough to complete within 30 minutes, apply the adhesive to the sub-floor using a notched trowel ensuring the whole sub-floor surface has an even amount of glue.Lay the new floor boards ensuring all boards have been pulled tight and have not been moved out of place as other boards have been fitted. It may be advisable to clamp up any slightly bent boards at this stage.
Leave the adhesive todry for 12 hours and do not walk on the floor until it is fully set. Unlike PVA adhesive, flooring adhesive is very {{{hard| difficult}} to remove from the surface of the boards. Ensure that any spills on the boards are wiped off immediately before the boards have dried.
Other Adhesive based fitting methods:
The are other adhesive based fitting options used to fit flooring:
1.Adhesive backed underlay. The underlay has a sticky side covered in a plastic film which is peeled back as the floor is laid. Envoy multi, Elastilon and Acoustalay adhesive 300/1000 are all types of adhesive backed underlay.
2.Slatted Underlay for use with adhesive. This underlay comes with narrow slats cut out � this enables the underlay to be used in conjunction with adhesive as the glue is applied in the cut-outs. The floor benefits from being glued down directly with the added advantage of having an underlay in between. This option is used when the floor is to be glued down directly but the sub floor is not completely flat.
Precautions
It is imperative that wood is given adequate chance to acclimatize before being bonded to the sub-floor. Allow at least two weeks for a solid wood floor and 48 hours for an engineered wood floor.
Take a thorough moisture check of the sub- floor for latent or rising damp. If in any doubt an application of an epoxy resin damp screen is advised.
P Flack has sinced written about articles on various topics from Home Appliances. Mark is sales manager of Birbek < HREF=http://www.birbek.com> Wood Floors. Birbek which is a UK distributor of european oak and specialises in . P Flack's top article generates over 720 views. to your Favourites.